Pentair 75 User Manual Page 14

  • Download
  • Add to my manuals
  • Print
  • Page
    / 24
  • Table of contents
  • TROUBLESHOOTING
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 13
14
P/N 471105 Rev. E 5-16-01
Installation (contd.)
WATER CONNECTIONS
QUICK-FLANGE II INSTALLATION INSTRUCTIONS
Figure 12.
FOR 1½ SCHEDULE 40 CPVC or ABS PIPE or SCHEDULE 80 PVC
(you may adapt to SCH 40 PVC 12 inches beyond the Quick Flange II)
(1½ in. npt x 1½ in. CPVC/ABS slip male adaptor may be required )
1. Insert 2 in. rubber gaskets over 2 in. gasket retainer rings molded to bottom of Quick-Flange II;
see Figure 12.
2. Bolt Quick-Flange II to header using supplied 3/8 in. bolts and 3/8 in. washers.
3. Using pipe dope, thread pipe directly to Quick-Flange II.
a. Or, first thread a 1½ in. npt x 1½ in. slip CPVC/ABS male adaptor (not supplied) to the
Quick-Flange II ,and after preparing the joint by sanding with a medium grit sandpaper,
glue the pipe to the adaptor with a quality solvent glue.
NOTE
ALL VERSIONS OF THE MINIMAX 100 INCLUDE A QUICK-FLANGE II ADAPTOR
Each MiniMax 100 Quick-Flange II Accessory Kit, p/n 471083,
contains the following items:
One (1) Quick-Flange II unit
Two (2) 2 in. Rubber Gaskets
Four (4) 3/8 in. Bolts
Four (4) 3/8 in. Washers
PRESSURE RELIEF VALVES
Where local, (or Canadian), codes require the use of a Pressure Relief Valve (PRV), the PRV may be
installed in a tee fitting placed as close as possible to the heater water outlet with no intervening valves
between the PRV and the heater.
Page view 13
1 2 ... 9 10 11 12 13 14 15 16 17 18 19 ... 23 24

Comments to this Manuals

No comments